We were engaged by Chelwest to develop a fully integrated children’s hospital on the 1st Floor of Chelsea and Westminster Hospital to achieve a vision of providing a world class children’s hospital.
This major investment by the hospital followed the designation as Chelwest becoming the lead centre for specialist children’s and neonatal surgery in North West London.
The new Chelsea Children’s Hospital includes:
4 state-of-the-art, dedicated children’s operating theatres
Revamped children’s wards
New day surgery ward
An extended Paediatric High Dependency Unit
Expanded surgical recovery area
The project was run under the NHS procurement system Procure 21 (P21) and Cliftons Projects were responsible for:
Consultant Appointments
Appointment of the PSCP Contractor
Acting at the P21 Project Manager
Design management
User engagement
Room data sheet collation
SOP production
Overseeing budget control
Programme monitoring
User satisfaction
Equipping and building occupation
Overall delivery
Project Manager: Cliftons Projects Ltd
Contracts Administration: Cliftons Projects Ltd
Quantity Surveyor: Christopher Smith Associates
Structural Engineer: Waterman Structures
Contractor: BAM (Design & Build)