IMG 0386

Rapid Response Healthcare: Fast-Track Solutions for Portsmouth NHS Trust

When winter bed pressures threatened hospital capacity, Portsmouth NHS Trust turned to Cliftons Projects for a rapid, effective solution. The challenge? Deliver a 12-bed modular ward and relocate the outpatient discharge lounge—all within just eight weeks.

A High-Stakes, High-Speed Project - Hospitals don’t have the luxury of pausing operations. Our team worked within a live hospital environment, carefully coordinating every phase to avoid disruption. The result?

A fully operational 12-bed ward, seamlessly integrated between two 24/7 medical units. A purpose-built outpatient discharge lounge, relocated to a modular facility without impacting patient care. Zero downtime, with every step, designed to ensure continuity for both staff and patients.

  • Project Manager:
    Cliftons Projects Ltd
  • Contracts Administration:
    Cliftons Projects Ltd
  • Quantity Surveyor:
    McPhersons
  • Architect:
    Studio 4
  • Service Engineer:
    TNG